| Home Site Map About Search | |||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| Home Courses News Vacancies Downloads | |||||||||||||||||||||||||||||||
|
|
Downloads: |
|
|||||||||||||||||||||||||||||
Brochures |
|||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| ISCaDE™
|
|||||||||||||||||||||||||||||||
| ISCaDE™
(Integrated Safety Case Development Environment) by rcm2 limited. ISCaDE™ is a unique, networked, DOORS-based software environment, which can help you build a high confidence safety case faster and with fewer experienced staff. |
|||||||||||||||||||||||||||||||
| Safety
Case Development
|
|||||||||||||||||||||||||||||||
rcm2 staff has been involved in the
setting up of various rail project safety management systems, using adaptations
of the system described in the "Yellow Book". rcm2 have worked setting
up and managing Hazard Logs for a number of rail projects (West Coast
Route Modernisation, Two Major Re-signalling Projects, ...). Our staff
has many years' experience generating and providing input into safety
cases for the UK rail industry. We have contributed to the safety case
of a novel hybrid automotive engine management system. |
|||||||||||||||||||||||||||||||
| DRACAS
|
|||||||||||||||||||||||||||||||
| Data Reporting Analysis and Corrective
Action System (DRACAS) is a recent product from rcm2 limited, an innovative
safety and reliability solution provider. DRACAS is a database used primarily
to enter faults/failures collected from a working system as well as required
improvements for procedures and processes. Based on this data, DRACAS produces
a history of faults/failures of the system components in both textual and
graphical formats. ...more |
|||||||||||||||||||||||||||||||
| DSTAR
|
|||||||||||||||||||||||||||||||
| Data Storage, Transfer, Analysis and
Reporting (DSTAR) system is a new product from rcm2 limited, an innovative
safety and reliability solution provider. DSTAR allows predictive maintenance
of railway signalling equipment based on data collected from its components
in real-time. It keeps a record of all controls on signals, indicates signal
aspects to be replaced and gives warning of abnormalities in railway points/switching
movements. ...more
|
|||||||||||||||||||||||||||||||
| Privacy Policy Legal Quality Support Contact About Us | |||||||||||||||||||||||||||||||
| Copyright (c) 2009, rcm2 limited, UK
All rights reserved. |
|||||||||||||||||||||||||||||||