Systems Engineering and Requirements Management |
||||||||||||||||||||||||||||||
Systems engineering is
about processes to ensure that stakeholders' requirements for a complex
engineering system is fully met. It is about a "holistic view" and
the glue that ensures multi-disciplinary activities are integrated to enable
the realisation of successful systems. |
||||||||||||||||||||||||||||||
Risk Assessment, Safety and Reliability Engineering |
||||||||||||||||||||||||||||||
rcm2 has extensive experience in modelling systems and their
components for the purposes of assurance of safety, reliability and other
performance capabilities. We are able to use any one or a combination of the
following techniques: Fault Tree Analysis, Event Tree Analysis,
Cause-Consequence Modelling, Failure Modes Effects Criticality Analysis
(FMECA), Reliability Prediction using MIL-HBK-217, Reliability Block Diagrams
(RBD) and Markov Analysis. |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
rcm2 has experience
in assisting management decision-making at all levels. We are adept at
applying any of the following soft techniques to optimise managerial decision
making:
|
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
rcm2 staff have been involved in the setting up of various
rail project safety management systems, using adaptations of the system
described in the "Yellow Book". rcm2 staff have worked
setting up and managing Hazard Logs for a number of rail projects (West Coast
Route Modernisation, Two Major Re-signalling Projects, ...). Our staff
have many years' experience generating and providing input into safety cases
for the UK rail industry. We have contributed to the safety case of a
novel hybrid automotive engine management system. |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
Expertise in
Reliability-Centred Maintenance and Remote Condition Monitoring Technology
and Solutions.
rcm2 is an Investors in People and an Equal Opportunity
Employer. ..go |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
We aim to provide the most reliable and safe environment in
the transit systems. |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
rcm2 staff have been involved in the
setting up of various rail project safety management systems, using
adaptations of the system described in the "Yellow Book". rcm2
staff have worked setting up and managing Hazard Logs for a number of rail
projects (West Coast Route Modernisation, Two Major Re-signalling Projects,
...). Our staff have many years' experience generating and providing input
into safety cases for the UK rail industry. We have contributed to the safety
case of a novel hybrid automotive engine management system. |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
Integration of legacy system with the modern surveillance
system has been done. The build module works as bridge between two different
age systems. It takes signal from one system and processes it to be received
by the other one and vice-versa. It offers compatibility between the
different systems. ..go |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
Data Storage, Transfer, Analysis and Reporting (DSTAR) system
is a new product from rcm2 limited, an innovative safety and reliability
solution provider. DSTAR allows predictive maintenance of railway signalling
equipment based on data collected from its components in real-time. It keeps
a record of all controls on signals, indicates signal aspects to be replaced
and gives warning of abnormalities in railway points/switching movements. ..go |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
We are committed to provide the best e-training solutions to
our valued customers. In this regard a lot many efforts had been put in. and
they have brought value outcomes indeed. |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
These are some of the lines showing our advancement in this
area. So that the user can have a look at. The text should be precise enough
to fit into this text box and revealing everything to be displayed on the
main page. The detail can be found in the section ..go |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
These are some of the lines showing our advancement in this
area. So that the user can have a look at. The text should be precise enough
to fit into this text box and revealing everything to be displayed on the
main page. The detail can be found in the section ..go |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
These are some of the lines showing our advancement in this
area. So that the user can have a look at. The text should be precise enough
to fit into this text box and revealing everything to be displayed on the
main page. The detail can be found in the section ..go |
||||||||||||||||||||||||||||||
Privacy Policy Legal Quality
Support Contact About Us |
||||||||||||||||||||||||||||||
Copyright (c) 2014, rcm2 limited, UK |